Expro Excellence
Cementing Technologies Well Construction
Siccar Point, Blackrock – SeaCure and CoreCure
Customer challenges
  • Offset well troubles with SSR plug non-bump and time consuming drill out.
Expro Excellence
  • Expro provided a clinical execution of our SeaCure® cementing service, delivering low risk, high value cementing operations.
Value to client
  • Delivered the 30” conductor cement job, enabling 53 bbls reduction in planned cement job (260% OH XS actual vs 300% OH XS planned)
  • Both 26” and 17 1/2” bits drilled to TD with no issues
  • No BHA failures in either 26” or 17 1/2” sections
  • Enabled continuation of 20” cement job after bulk delivery valve actuation replacement mid-way through cement job vs pumping 231 bbls of cement to the sea and re-commencing the job.
Contact

Siccar Point, Blackrock – SeaCure and CoreCure

In Brief
SeaCure® services optimize drill out and remove previous risks associated with SSR plugs
Product Line
  • Cementing Technologies
  • Well Construction
Region
Europe and Sub Saharan Africa
Customer challenges
  • Offset well troubles with SSR plug non-bump and time consuming drill out.
Expro Excellence
  • Expro provided a clinical execution of our SeaCure® cementing service, delivering low risk, high value cementing operations.
Value to client
  • Delivered the 30” conductor cement job, enabling 53 bbls reduction in planned cement job (260% OH XS actual vs 300% OH XS planned)
  • Both 26” and 17 1/2” bits drilled to TD with no issues
  • No BHA failures in either 26” or 17 1/2” sections
  • Enabled continuation of 20” cement job after bulk delivery valve actuation replacement mid-way through cement job vs pumping 231 bbls of cement to the sea and re-commencing the job.
Contact

For further information, please contact:

cementing@expro.com