Expro Excellence
Subsea Well Access
Expro Subsea Well Access delivery and adaptability saves customer approximately 3 days rig time
Customer challenges
  • The customer’s operations were in the remote location of Equatorial Guinea which added additional challenges to the project
  • The customer had a tight delivery for the first well on the original rig chosen for the operation. Expro’s project management and delivery teams provided extraordinary performance in meeting client delivery expectations
  • A late change in the customer’s requirements resulted in a change from a 9 5/8” slick joint to a 7 5/8” slick joint. We were able to implement this alternative solution by sourcing equipment from our vast equipment inventory. This change prevented the customer from having to pull the BOP prior to completion operations saving them at least three days of rig time
  • After the first well, the customer changed out the rig which resultedi n Expro requiring a reconfiguration of equipment to the new rig BOP.  Expro modified existing equipment by performing machining work in Equatorial Guinea, ensuring the interface with the new rig was seamless and no downtime was encountered
Expro Excellence
  • The customer was deploying two new development wells and performed an intervention on one offshore well in Equatorial Guinea.  Expro's local content and adaptability ensured machining work could be performed in country to meet the operational timeline
  • Delivery, support and operational personnel exceeded expectations to ensure clients deadlines were met and no operational downtime encountered
  • Expro offshore crew commended by both client and rig operator for safety and performance, having adapted seamlessly to different safety management systems across both rigs utilized
Value to client
  • Expro's experience, track record and vast rental inventory contributed to significant cost savings by  providing efficiencies in operations, saving approximately 3 days in rig time
Contact

Expro Subsea Well Access delivery and adaptability saves customer approximately 3 days rig time

In Brief
Expro's Subsea Well Access solution enhances deliverability and adaptability, helping the customer save approximately three days of rig time
Product Line
  • Subsea Well Access
Region
Europe and Sub Saharan Africa
Customer challenges
  • The customer’s operations were in the remote location of Equatorial Guinea which added additional challenges to the project
  • The customer had a tight delivery for the first well on the original rig chosen for the operation. Expro’s project management and delivery teams provided extraordinary performance in meeting client delivery expectations
  • A late change in the customer’s requirements resulted in a change from a 9 5/8” slick joint to a 7 5/8” slick joint. We were able to implement this alternative solution by sourcing equipment from our vast equipment inventory. This change prevented the customer from having to pull the BOP prior to completion operations saving them at least three days of rig time
  • After the first well, the customer changed out the rig which resultedi n Expro requiring a reconfiguration of equipment to the new rig BOP.  Expro modified existing equipment by performing machining work in Equatorial Guinea, ensuring the interface with the new rig was seamless and no downtime was encountered
Expro Excellence
  • The customer was deploying two new development wells and performed an intervention on one offshore well in Equatorial Guinea.  Expro's local content and adaptability ensured machining work could be performed in country to meet the operational timeline
  • Delivery, support and operational personnel exceeded expectations to ensure clients deadlines were met and no operational downtime encountered
  • Expro offshore crew commended by both client and rig operator for safety and performance, having adapted seamlessly to different safety management systems across both rigs utilized
Value to client
  • Expro's experience, track record and vast rental inventory contributed to significant cost savings by  providing efficiencies in operations, saving approximately 3 days in rig time