Customer challenges
- Expro was approached by a long standing, major operator to develop a solution to restart production, for a gas injection well which indicated a leak between the A and B annulus
- This was causing the customer both well integrity and safety issues, resulting in lost production and revenue
- The customer did not have the integrity required in the production of the well and as a result they could not use gas lift
Expro Excellence
- Expro offered a bespoke solution with the placement of 360º low-density sealant in the B-annulus. (The low density sealant was placed in the annulus fluid allowing the sealant to float up to the leakage point on top of the B-annulus)
- Expro developed a bespoke fluid injection tool in collaboration with the customer to fit this well. The tool was used to evenly distribute fluid in the annulus of the LD seal (360º)
- Expro prevented the customer from having to hire a jack-up rig for the re-completion of the well
Value to client
- Expro secured a 360º placement of the sealant, no other competitors have the ability to enter and intervene the annulus, we are the only providers of this service
- Expro repaired the integrity issue without re-completion of the well (with out the use of a jack-up rig, saving the customer in excess of $1M). This significantly reduced the customers cost
- After the project was completed, the customer was able to commence gas lift and put the well back into production with 3,500 bbls/day
Expro helped increase recovery through restoring:
- Gas lift
- Well integrity
- Production
- The sealant was placed in the B annulus to prevent blocking gas injection in the annulus. Pressure testing to 90 bars was achieved from the annulus resulting in restored gas injection for the customer
- Expro's solution was developed in cooperation with the customer and this bespoke solution resulted in rapid mobilisation