Expro Excellence
Production Solutions
Reducing flaring through gas compression solution
Customer challenges
  • Natural gas flaring represents a lost economic opportunity but is also a major source of greenhouse gas emissions
  • Gas was being flared at multiple production sites due to the unavailability of the appropriate processing infrastructure
  • Our customer had a solution but in review was considered unreliable and sub economic
Expro Excellence
  • Expro undertook a detailed comparative study to find an economic alternative to gas flaring 
  • The resulting solution utilised a gas to power compressor at 10 sites
  • Expro delivered, installed and commissioned the compressors within 32 weeks (contract award to first gas)
Value to client
  • Fast-track equipment delivery enabled customer to obtain reduced flared gas gains and optimise production to meet export commitments and increase life of field
  • Produced Gas to Power compressors were utilised which significantly reduced OPEX costs at the 10 sites significantly increasing customers ROI
  • Customer reduced Green House Gas Emissions across the 10 sites by up to 10,000 Tons CO2e per day
Contact

Reducing flaring through gas compression solution

In Brief
Fast-track equipment delivery enabled customer to obtain reduced flared gas gains and optimise production
Product Line
  • Production Solutions
Region
Middle East And North Africa
Customer challenges
  • Natural gas flaring represents a lost economic opportunity but is also a major source of greenhouse gas emissions
  • Gas was being flared at multiple production sites due to the unavailability of the appropriate processing infrastructure
  • Our customer had a solution but in review was considered unreliable and sub economic
Expro Excellence
  • Expro undertook a detailed comparative study to find an economic alternative to gas flaring 
  • The resulting solution utilised a gas to power compressor at 10 sites
  • Expro delivered, installed and commissioned the compressors within 32 weeks (contract award to first gas)
Value to client
  • Fast-track equipment delivery enabled customer to obtain reduced flared gas gains and optimise production to meet export commitments and increase life of field
  • Produced Gas to Power compressors were utilised which significantly reduced OPEX costs at the 10 sites significantly increasing customers ROI
  • Customer reduced Green House Gas Emissions across the 10 sites by up to 10,000 Tons CO2e per day
Contact

For further information, please contact:

production@expro.com