Customer challenges
  • Expro’s client had the requirement for a subsea well access system to provide well barriers during a subsea well abandonment campaign in West Africa
  • This abandonment campaign was to be carried out by a drill ship with a dual activity drill floor
  • Expro supported our client with the provision of an Open Water Intervention Riser System (OWIRS) and controls package (SPS Xmas Tree and OWIRS controls)
  • Expro provided project management, interface engineering and service personnel to deliver the full scope, which included a compact OWIRS, surface flowhead, umbilical’s, topsides control equipment and IWOCs package under the one integrated contract
  • Our customer required a rental OWIRS as their subsea well access method to interface with the Xmas Tree because:
  • Xmas Tree type and upper interface could not accommodate a drilling BOP
  • The original workover system was no longer available
  • Coil tubing intervention as a contingency was ruled out of RWIS
Expro Excellence
  • OWIRS system was successfully bunny hopped for six wells in the schedule: system subsea for just over three weeks
  • Personnel skill sets were transferred from Expro’s SSTTA product line
  • Zero leak gas testing was carried out on the main barriers post operation, proving the system reliability after more than 250 functions and 16 months in the field
  • Performance recognised by client in Australia who will now take equipment on rental to perform very similar work scope
Value to client
  • OWIRS system was successfully bunny hopped for six wells in the schedule: system subsea for just over three weeks
  • Personnel skill sets were transferred from Expro’s SSTTA product line
  • Zero leak gas testing was carried out on the main barriers post operation, proving the system reliability after more than 250 functions and 16 months in the field
  • Performance recognised by client in Australia who will now take equipment on rental to perform very similar work scope
Contact

Expro completes 15 well abandonment campaign with zero NPT

In Brief
Expro executed the 15 well campaign with equipment that carried out over 250 functions with 100% uptime and zero NPT
Product Line
  • Subsea Well Access
Region
Europe and Sub Saharan Africa
Customer challenges
  • Expro’s client had the requirement for a subsea well access system to provide well barriers during a subsea well abandonment campaign in West Africa
  • This abandonment campaign was to be carried out by a drill ship with a dual activity drill floor
  • Expro supported our client with the provision of an Open Water Intervention Riser System (OWIRS) and controls package (SPS Xmas Tree and OWIRS controls)
  • Expro provided project management, interface engineering and service personnel to deliver the full scope, which included a compact OWIRS, surface flowhead, umbilical’s, topsides control equipment and IWOCs package under the one integrated contract
  • Our customer required a rental OWIRS as their subsea well access method to interface with the Xmas Tree because:
  • Xmas Tree type and upper interface could not accommodate a drilling BOP
  • The original workover system was no longer available
  • Coil tubing intervention as a contingency was ruled out of RWIS
Expro Excellence
  • OWIRS system was successfully bunny hopped for six wells in the schedule: system subsea for just over three weeks
  • Personnel skill sets were transferred from Expro’s SSTTA product line
  • Zero leak gas testing was carried out on the main barriers post operation, proving the system reliability after more than 250 functions and 16 months in the field
  • Performance recognised by client in Australia who will now take equipment on rental to perform very similar work scope
Value to client
  • OWIRS system was successfully bunny hopped for six wells in the schedule: system subsea for just over three weeks
  • Personnel skill sets were transferred from Expro’s SSTTA product line
  • Zero leak gas testing was carried out on the main barriers post operation, proving the system reliability after more than 250 functions and 16 months in the field
  • Performance recognised by client in Australia who will now take equipment on rental to perform very similar work scope