Customer challenges
- Our client was looking to achieve a quality 7” liner cement job with minimal contamination and an optimized liner shoe track
Expro Excellence
- Expro’s SeaCure® R cementing, combined with CureCatcher® solution, delivered the ultimate cement placement
Value to client
- Quality primary cement job
- Multiple mechanical interfaces caught in catcher sleeve in collar to minimize contamination
- Optimized shoe track solution
- No clean out trips required
- Post cement job full well bore circulation with work string already at TD
- 6” BHA drilled to section TD for 8 days at high temperature