Expro Excellence
Cementing Technologies Well Construction
Anonymous – SeaCureRS 7” Liner & CureCatcher
Customer challenges
  • Our client was looking to achieve a quality 7” liner cement job with minimal contamination and an optimized liner shoe track
Expro Excellence
  • Expro’s SeaCure® R cementing, combined with CureCatcher® solution, delivered the ultimate cement placement
Value to client
  • Quality primary cement job
  • Multiple mechanical interfaces caught in catcher sleeve in collar to minimize contamination
  • Optimized shoe track solution
  • No clean out trips required
  • Post cement job full well bore circulation with work string already at TD
  • 6” BHA drilled to section TD for 8 days at high temperature
Contact

Anonymous – SeaCureRS 7” Liner & CureCatcher

In Brief
SeaCureRS & CureCatcher® deliver quality primary cement job with optimized liner shoetrack
Product Line
  • Cementing Technologies
  • Well Construction
Region
Europe and Sub Saharan Africa
Customer challenges
  • Our client was looking to achieve a quality 7” liner cement job with minimal contamination and an optimized liner shoe track
Expro Excellence
  • Expro’s SeaCure® R cementing, combined with CureCatcher® solution, delivered the ultimate cement placement
Value to client
  • Quality primary cement job
  • Multiple mechanical interfaces caught in catcher sleeve in collar to minimize contamination
  • Optimized shoe track solution
  • No clean out trips required
  • Post cement job full well bore circulation with work string already at TD
  • 6” BHA drilled to section TD for 8 days at high temperature
Contact

For further information, please contact:

cementing@expro.com